Sending to SolidCAM in progress...

Downloaded file will be available after import in the SolidCAM tool library.

Shell Mill Adaptors with Through Coolant
Shell Mill Adaptors with Through Coolant
Shell Mill Adaptors with Through Coolant
Shell Mill Adaptors with Through Coolant
Shell Mill Adaptors with Through Coolant
Shell Mill Adaptors with Through Coolant
Select the files you wish to request
Downloads
Request {{cadTool}} format
{{cadTool}} format is not available

SMC Lock MM-HSK A型装置 • 套式铣刀接头

Shell Mill Adaptors with Through Coolant

Metric
Inch
SAP 材料编号 3872692
ISO 目录编号 HSK63ASMC32160M
ANSI 目录编号 HSK63ASMC32160M
[D1] 适配接头/刀柄/镗孔直径 32 mm
[D1] 适配接头/刀柄/镗孔直径 1.259 in
[D2] 工件侧钻体直径 1 78 mm
[D2] 工件侧钻体直径 1 3.07 in
[L1] 量规长度 160 mm
[L1] 量规长度 6.299 in
刀具固定螺钉 ID 扳手规格 14 mm
重量(千克) 3.59
查看所有产品变体

Uses and application

  • 设计平衡 设计平衡
  • 铣削 —  贯通式冷却铣削 — 贯通式冷却
  • 铣削 —  侧铣和端面铣铣削 — 侧铣和端面铣
  • Shank: HSK DIN 69893 Form AShank: HSK DIN 69893 Form A

机床侧

loading...

工件侧

loading...

备件 for SMC Lock MM-HSK A型装置 • 套式铣刀接头

Spare Part
    183M SOLID SHELL MILL RETAINING SCREW 183M SOLID SHELL MILL RETAINING SCREW
    183M SOLID SHELL MILL RETAINING SCREW
    您即将把 添加至“我的解决方案”页面. 是否要继续?
    product-image
    Please adjust the following properties from

    ISO Catalog

    ANSI Catalog

    to find similar products.

    The following files are available

    Please select a file to download

    Models

    Product data

    应记录以查看仪表盘信息
    Session expired due to inactivity, please login again
    您尝试添加到购物车的产品 () 不可用,请 联系客户服务部。
    件物品已成功添加到购物车
    View Cart

    . Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

    Minimum quantity should be

    SAP Material Number ISO Catalog Grade    
    Thank you for your registration, pending approval & completion of the registration, your access is currently limited. Full utilization of product search capabilities & collaboration space is available and will remain. Please allow 2 business days for registration completion.

    You are about to leave the Solution building process.

    Are you sure you want to leave?