Sending to SolidCAM in progress...

Downloaded file will be available after import in the SolidCAM tool library.

TOP DRILL T 三排屑槽 • 有色金属材料
TOP DRILL T 三排屑槽 • 有色金属材料
TOP DRILL T 三排屑槽 • 有色金属材料
TOP DRILL T 三排屑槽 • 有色金属材料
Select the files you wish to request
Downloads SDS
Request {{cadTool}} format
{{cadTool}} format is not available

TDT751A • WN15HD™ • A 型柄 • 5 x D

TOP DRILL T 三排屑槽 • 有色金属材料

Metric
Inch
SAP 材料编号 6197155
ISO 目录编号 TDT752A14000
ANSI 目录编号 TDT752A14000
材质 WN15HD
[D1] 钻头直径 M 14 mm
[D1] 钻头直径 M .5512 in
[L] 总长 124 mm
[L] 总长 4.881 in
[L3] 排屑槽长度 77 mm
[L3] 排屑槽长度 3.031 in
[L4] 最大钻孔深度 60 mm
[L4] 最大钻孔深度 2.362 in
[L5] 钻尖长度 3.497 mm
[L5] 钻尖长度 .1377 in
[LS] 刀柄长度 45 mm
[LS] 刀柄长度 1.771 in
[D]适配接头/刀柄/镗孔直径 14 mm
[D]适配接头/刀柄/镗孔直径 .5512 in
查看所有产品变体

Uses and application

  • DrillingDrilling
  • Drilling: Inclined EntryDrilling: Inclined Entry
  • Drilling: Inclined ExitDrilling: Inclined Exit
  • Drilling: Stacked PlatesDrilling: Stacked Plates
  • 射流冷却: 钻孔射流冷却: 钻孔
  • 刀柄—  圆柱 平面度 ≤h6刀柄— 圆柱 平面度 ≤h6
  • 螺旋角: 30°螺旋角: 30°
  • 3851238512

工件材料

K 铸铁
N 非铁材质

Features and benefits



  • Top drill T 带有三个排屑槽,无内部冷却液,可提高钻芯稳定性。

  • 专为铝和有色金属材料钻孔而设计。作为第二选择,可应用于钛加工。

  • 高抛光排屑槽,可实现顺畅的排屑和更快的钻速。

  • 三个切削刃,实现更高的进给量。

  • 三刃带倒棱,实现高孔精度。

机床侧

loading...

工件侧

loading...
您即将把 添加至“我的解决方案”页面. 是否要继续?
product-image
Please adjust the following properties from

ISO Catalog

ANSI Catalog

to find similar products.

The following files are available

Please select a file to download

Models

Product data

应记录以查看仪表盘信息
Session expired due to inactivity, please login again
您尝试添加到购物车的产品 () 不可用,请 联系客户服务部。
件物品已成功添加到购物车
View Cart

. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material Number ISO Catalog Grade    
Thank you for your registration, pending approval & completion of the registration, your access is currently limited. Full utilization of product search capabilities & collaboration space is available and will remain. Please allow 2 business days for registration completion.

You are about to leave the Solution building process.

Are you sure you want to leave?