Force, Torque, and Power

These calculations are based upon theoretical values and are only intended for planning purposes. Actual results will vary. No responsibility from Kennametal is assumed.

Baseline Carbide Tooling Information
Metric
Inch

Conversion of Workpiece Material Rockwell (Optional)

Skip this step if you already know the Brinell hardness number(HB)
Characteristics of Workpiece Materials

Characteristics of Workpiece Materials

HB
PSI N/mm 2
Ultimate Strength shown for generic steel. Please enter the actual value of your workpiece material if available&#44 for better accuracy You may look up this info through websites such as www.matweb.com
Z axis Mill Nomenclature

Z axis Mill Nomenclature

in mm
Machining Conditions

Machining Conditions

sfm m/min
in mm
in. IPT (chip load) mm
Machinability factors
Most Common
Workpiece Materials
Cm at W/D ratios:
W/D < = 0.66 0.66 < W/D < 1.0 W/D = 1.0
Aluminum alloys 1.0 1.05 1.1
Carbon and alloy steels 1.0 1.15 1.3
Cast irons 1.0 1.15 1.3
Titanium alloys 1.0 1.20 1.4
Stainless steel&#44 High-temperature alloys 2.0 2.15 2.3
Machine Tool Efficiency factors
Direct Belt Drive .9
Back Gear Drive .75
Geared Head Drive .7-.8
Oil - Hydraulic Drive .6-.7
Calculated Machining Conditions

CalculatedMachiningConditions.heading.label

RPM
IPM (no productivity formula) mm/min (no productivity formula)
MRR cm3/min
in.2 mm2
Calculated Required Power

Calculated Required Power

HPc kW
hp kW
Si sta per aggiungere alla pagina Le mie soluzioni. Continuare?
product-image
Please adjust the following properties from

ISO Catalogo

ANSI Catalogo

to find similar products.

The following files are available

Please select a file to download

Models

Product data

Per visualizzare le informazioni sul dashboard è necessario eseguire l’accesso
Session expired due to inactivity, please login again
Il prodotto/prodotti () che si sta/stanno tentando di aggiungere al carrello non è/sono disponibile/i contattare il Servizio clienti.
articolo/i aggiunto/i correttamente al carrello
View Cart

. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material Number ISO Catalogo Grade    
Thank you for your registration, pending approval & completion of the registration, your access is currently limited. Full utilization of product search capabilities & collaboration space is available and will remain. Please allow 2 business days for registration completion.

You are about to leave the Solution building process.

Are you sure you want to leave?